Manifold systems and accessories
Starting from a number of 3 geothermal heat probes, the fluid flow from the geothermal heat probes is accumulated in a collector/ manifold system.
GEROTHERM - manifold/ collector made of PE-HD
Manifold made of PE-HD with ball valve as cut-off valve for the individual probe circuits. |
Manifold made of PE-HD with control valve SETTER to control the quantities with partial flows of differing sizes. |
Different designs of large manifolds. |
Manifold made of premium steel with ball valve as cut-off valve for the individual probe circuits. |
Manifold made of premium steel with control valve SETTER to control the quantities with partial flows of differing sizes. |
The anti-freeze agent STÜWASOL L is a long-term frost and corrosion protection concentrate for heat pump systems. The concentrate is rated water pollution class 1 (slightly water polluting). |
After the geothermal heat probe is installed in the substratum, a pressure test is conducted in the system that is required by the law. For this purpose, a test pressure of 6bar is exerted that is allowed to drop 0.2bar at a maximum after a preload time in the test period of 60 minutes. |
The manifold/collector system is already integrated in the PE-HD shaft and the shaft can be installed effortlessly due to its low weight. The PE-HD shaft can be manufactured for the necessary number of manifold/collector circuits. |







